This new ferry bridge which spans 300 meters long will connect Kinniya to Trincomalee on the Batticaloa – Thirukkondiyadimadu Trincomalee Road. Dynamic Pile Testing was conducted on 1200mm diameter bored piles using a 5-ton drop hammer to test the load carrying capacity of the piles at off shore locations. The process employed specially designed equipment.

Client
China National Automotive Industry Guizhou Imp & Exp Corporation
Date / Period
June 2007 to April 2008
Scope / Work Done
The investigation comprised
- 7 nos of Dynamic Pile Test (PDA) off-shore
- one PDA on-shore